Customization: | Available |
---|---|
After-sales Service: | Quality Assurance |
Max. Lifting Height: | 9.6m |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HGY pipelayer is mainly used for pipe hoisting operations in pipeline construction, such as pipe transportation, pipe laying, assembly and trenching. The pipelayer chassis is a special hydraulic chassis for developed on the basis of mature excavator chassis technology. The traveling system adopts hydrostatic transmission mode, with small impact on start and stop, and can realize in-situ steering; The lifting system adopts full hydraulic transmission, with stable transmission and good micro motion performance. Compared with the traditional bulldozer chassis pipelayer, it has obvious technical and application advantages.
Model
|
HGY20
|
HGY40
|
HGY70
|
HGY90
|
||
Max.lifting capacity
|
25t
|
45.7t
|
70t
|
90t
|
||
Rated lifting capacity
|
21.25t
|
38.25t
|
59.5t
|
76.5t
|
||
Operating weight(approx)
|
22t
|
35t
|
49t
|
55t
|
||
Shipping outline dimension for main equipment(L*W*H)
|
4150×3050×3250 (mm)
|
4855×3384×3270 (mm)
|
5630×3400×3540 (mm)
|
5630×3436×3540 (mm)
|
||
Shipping weight for main equipment
|
21.5t
|
26t
|
37.5t
|
38.9t
|
||
Average ground pressure
|
76.4KPa
|
85.2KPa
|
87.3KPa
|
86.6KPa
|
||
Min.ground clearance
|
480mm
|
490mm
|
550mm
|
550mm
|
||
Max.gradeability
|
25°
|
25°
|
25°
|
25°
|
||
Applicable environment
|
-50ºC ~+65ºC
|
-50ºC ~+65ºC
|
-50ºC ~+65ºC
|
-50ºC ~+65ºC
|
||
Engine
|
Model
|
SHANGCHAI SV11CB
|
NT855-C280
|
NT855-C280
|
NT855-C280
|
|
Rated power
|
120KW
|
169KW
|
239KW
|
257KW1850rpm
|
||
Rated rotary speed
|
1850rpm
|
2000rpm
|
2000rpm
|
2000rpm
|
||
Walking system
|
Operation mode
|
Joystick
|
Joystick
|
Joystick
|
Joystick
|
|
Theoretical speed
|
Forward
(shift2)
|
3.29/5.28 km/h
|
3.6/6.6 km/h
|
3.6/6.6 km/h
|
3.6/6.6 km/h
|
|
Backward
(shift2)
|
4.28/7.59 km/h
|
4.3/7.7 km/h
|
4.4/7.8 km/h
|
4.4/7.8 km/h
|
||
Length of track on ground
|
2635mm
|
3050mm
|
3620mm
|
3620mm
|
||
Track width
|
560mm
|
660mm
|
760mm
|
760mm
|
||
Number of track rollers
|
7×2
|
7×2
|
9×2
|
9×2
|
||
Crane system
|
Range form
|
The wire rope luffing form
|
The wire rope luffing form
|
The wire rope luffing form
|
The wire rope luffing form
|
|
Operating mode
|
The hydraulic control handle
|
The hydraulic control handle
|
The hydraulic control handle
|
The hydraulic control handle
|
||
Crane link
|
The length of the crane link
|
6000mm
|
7500/8500mm
|
7600/8600mm
|
8600/9600mm
|
|
Max lifting height
|
4909mm
|
6100/7050mm
|
6100/7050mm
|
7050/9600mm
|
||
The crane link luffing angle
|
0~85°
|
0~86°
|
0~86°
|
0~86°
|
||
Hook speed(six to eight times)
|
0~12.0m/min
|
0~6.2 m/min
|
0~7.0 m/min
|
0~7.0 m/min
|
||
Elevating time(four to five times)
|
25s
|
20s
|
32s
|
40s
|
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
Our Services & Strength
*We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
*Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
*To support project execution, we are always ready to work as fireman to give prompt supply on project material from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.